Construction of staircase|Civil engineering| Concrete

 





The construction of staircase consists of following steps:

  1. Place staircase slab formwork
  2. Paint oil no slab formwork
  3. Place main and secondary steel reinforcements bars.
  4. Place Wooden planks(Moulds) for steps
  5. Pour concrete with specified strength.
  6. Start Curing with water after 24 hours of placing concrete.
  7. Cure for 14 to 28days until concrete gains sufficient strength.


No comments:

Post a Comment