Pond curing of slab | construction of building | curing of building

 


Pond curing of slab

1. Curing of concrete is defined as providing adequate moisture, temperature, and time to allow the concrete to achieve the desired properties for its intended use.

2. The fresh concrete should be covered with plastic to protect from wind and rain.

3.  Curing should be started from 24hrs of concrete. 

4.  Curing is done till concrete attain sufficient strength.

5.  Curing is done upto 28days.